St Joe Community Foundation Reef 2

DESCRIPTION:
Placed on 17 Jul 2020 with joint funding from MBARA and St Joe Community Foundation. 9 Super Reefs, steel reinforced concrete/limestone, 15'H X 15-ft triangular base, 36,000 lbs ea. 9 Ecosystem on Pedestal 5'H X 42" Dia, 4,000 lbs each. 13 Florida Limestone Artificial Reef mod, steel reinforced concrete, 8'H X 10-ft triangular base, 5,000 lbs ea. 2 Grouper Reefs, steel reinforced concrete/limestone, 5'H X 9'L X 6'W, 7,000 lbs ea. Verified by Bob Cox on 18 Jul 2020.

LOCATION:
Reef Area: Sherman Site
TD1:
TD2:
LAT: 29 55.096
LON: 85 39.120
Range: 11.7
Bearing: 261
Depth: 80 feet
Range and Bearing is taken from mouth of Mexico Beach Canal.