DESCRIPTION:
3 Steel Cable Spools. 22 feet in diameter by 18 feet long. Reef height 22 feet. 100-foot separations between spools. Older ARI Pyramid in between 2 spools. Deployed on 20 Sep 2016. Verified by Bob Cox on 25 Jul 2021.
LOCATION: Reef Area: Sherman Site TD1: TD2: LAT: 29 55.082 LON: 85 40.755 Range: 13.1 Bearing: 262 Depth: 80 feet
Range and Bearing is taken from mouth of Mexico Beach Canal.